Pinned fleet, feasibility and morale balance
- The Pinned fleet is the vehicle groups and single vehicles that are to run the schedule. You add them with Add to fleet (any mix). The cross on a tile unpins the group or vehicle — it does not delete the vehicle.
- The members of a pinned vehicle group are read live: a vehicle added to the group later counts too (when the tasks are copied or in continuous mode).
- A vehicle can have only one active schedule at a time.
- A vehicle tile shows its real morale and the Queued: N label (green when the queue is running). So before assigning you see that the vehicle already has tasks — the new ones will join behind them as further loops.
- The feasibility card (when creating from a group): capacity, number of vehicles and convoys, number of transports, estimated time, drivers and morale balance. It also lists contracts no vehicle fits ("No compatible vehicle", "Different land").
- A trip step is run only by a vehicle with a matching cargo type that stands on the same landmass as the loading point. Other vehicles simply skip it — that is neither an error nor a block.
- The Morale balance counts per loop: drain, restore, overnight renewal, net and loop hours. It says whether the loop sustains itself, or how many hours of rest to add.
- The Single crew / Double crew switch is only a "what if" preview: it recalculates the balance as if the whole fleet drove with that crew. It changes nothing in the vehicles.
All FAQ answers