Schedule loops — priority, pin and arrow
- A loop (cycle) is a group of steps with one priority, marked P1, P2…. Steps in a loop run in order.
- How the autopilot picks work: at every decision it starts from the highest-priority loop (P1) and takes the first step that can run right now. When a loop has nothing to do (contracts used up, the step does not fit the vehicle), it moves down to the next loop.
- When work appears again in a higher loop, the vehicle goes back to it — but only after the current trip ends. Trips are never interrupted.
- Arrow — "Finish loop first" (switched on by default): the vehicle repeats this loop as long as its trip or supply run still has cargo to deliver, and takes the next loop only when no contract is left in this one. When a step cannot start (no cargo, a pause after an error, a busy workshop), the vehicle waits in this loop.
- Switched off — "Next if blocked": when no step of the loop can start right now, the autopilot takes the next loop at once and comes back when something can be done again.
- Steps this vehicle will never do (different cargo type, different landmass) do not hold the loop. Skipped and switched-off steps count as finished. A loop with no contracts (e.g. just a rest or a distribution) runs once.
- Pin — default loop: a loop without a number, always checked last, run only when no other loop has anything to do. Good for standing hauls, e.g. between factories in the gaps between contracts. One per schedule — pinning another moves the pin. Note: an arrow switched on in an earlier loop also blocks the way to the default loop.
- Managing loops: Add cycle, rename (pencil), reorder by dragging (on a phone with the ↑/↓ arrows), Delete cycle, and Remove finished steps clears steps whose contracts are delivered or no longer exist.
- The board has map / tiles / list views; between trips you see the empty legs with their effect on morale. The i button next to the Cycles & steps heading opens "How the plan works".
All FAQ answers