Contract group, schedule and autopilot — how they differ
- These are three different things that are easy to mix up. Each answers a different question:
- Contract group (menu: Contract groups) — WHICH contracts? A set of signed freight and supply contracts you want to handle together, e.g. one supply chain. On its own it carries nothing.
- Schedule — WHAT, and in which order? A plan made of loops (cycles) and steps: a trip, a supply run, a transfer between buildings, rest, refuelling, repair, crew change, return to base. It is a draft (template) — laying out steps does not run anything.
- Autopilot — WHAT is THIS vehicle doing now? The vehicle's own task queue, which it actually executes. It is created when you click Assign tasks to autopilot in the schedule — the steps are then copied to every vehicle of the pinned fleet.
- The key consequence: changing the schedule does not change vehicles that already got a copy. To give a vehicle the new plan, assign the tasks again or use Reset to template on the vehicle's tasks page. The exception is continuous mode (only an administrator can switch it on) — there vehicles run straight from the schedule, with no copy.
- Do not confuse a contract group with a vehicle group (the tabs above the Vehicles list). A vehicle group is just a set of vehicles — in a schedule you pin it as the fleet, and its members are read live.
- One schedule can serve many vehicles, and one contract group can have several schedules (variants). A schedule can also be created without a group — just for transport between your own buildings.
- The autopilot is available only in worlds that enabled it; without it you will not see these buttons.
All FAQ answers