Processing factories — production orders
- Input is taken at the start — for all ordered cycles at once, regardless of the number of lines.
- Lines = factory level. You can split them between several recipes or give all of them to one: cycle time = recipe time divided by lines. The total of lines cannot exceed the level.
- Cancelling a running order does not refund the input (a full loss). Cancelling an item that is still waiting in the queue costs nothing.
- Queue. When a start cannot happen (no free line, missing goods, full output storage), the order goes to the queue with a badge giving the reason; change the order with the ↑/↓ arrows.
- Partial batch. When goods are short, the batch starts on what is there — in proportion to the scarcest ingredient; the time shortens the same way (but not below a certain minimum).
- Continuous work and loops. The "produce continuously" option and the loop plan (Loops and recipe, one per factory): after N loops or "when the input runs out" the factory switches to the next recipe.
- The recipe card shows the value added per cycle at Market prices — that is how you compare profitability.
- Weather can lengthen or shorten production in a processing factory.
- Completed production gives complexity points — the only source of freedom level progress.
- Individual factories in the catalogue have their own required freedom level (a crown badge in the build catalogue).
All FAQ answers